LF Beauty (Process Control) – New Formulation Skid

Project Details

The installation of the additional Skid enables LF Beauty to increase the capacity of the formulation process by an additional 30%.

C.B.S.’ remit included the installation of: electrical installation, instrumentation installation, pneumatic installation and installation of associated works, in connection with a ‘new chilled water’ distribution system.

The design philosophy covers: conventionally wired automated valves and instrumentation, wired back to PLC panels, Plant operation is via HMI panels situated within the field.

Electrical Value £60,000
Contract Period 3 Months
Completion April 2011
Client LF Beauty
Main Contractor Briggs of Burton