Project Details
The installation of the additional Skid enables LF Beauty to increase the capacity of the formulation process by an additional 30%.
C.B.S.’ remit included the installation of: electrical installation, instrumentation installation, pneumatic installation and installation of associated works, in connection with a ‘new chilled water’ distribution system.
The design philosophy covers: conventionally wired automated valves and instrumentation, wired back to PLC panels, Plant operation is via HMI panels situated within the field.
| Electrical Value | £60,000 |
| Contract Period | 3 Months |
| Completion | April 2011 |
| Client | LF Beauty |
| Main Contractor | Briggs of Burton |